ServicesGeneral ContractingProper planning prior to the construction phase of a project ensures high-quality results. During the planning phase, we:
Design/BuildOverview Design/Build delivery system is based upon the original master builder concept used to build most pre-moderned projects. Under the master builder approach Altech, Inc. is responsible for the total project accountability. From inception to completion through performance, the master builder was the key organizational figure. The design/build system is a return to the fundamentals of the master builder ideals. Accountability Rather than a parcelized level of responsibility of the classic design-bid-build, design-build provides an integrated solution for the owner or client. This provides refuge from the finger-pointing that has become (unfortunately) commonplace in modern construction projects and allows the owner to look to one entity with questions or concerns. Single Source Having several contractors and consultants to deal with, an owner has just one contact for the project. Design revisions, project feedback, budgeting, permitting, construction issues, and billing can all be routed through Altech, Inc. This single point of contact allows maximum flexibility for the owner to insist on a particular course of action without having to readjust contracts with perhaps a dozen contractors. Altech, Inc. will leverage that flexibility for the owner's benefit by continually refining the construction program to maximize the owner's value at the completion of the project. Value-Based Project Feedback Typically, in order for a contractor to bid on a project, very specific details relating to the methods and materials must be given to avoid any ambiguity and to make an "apples to apples" comparison of bids. In a design-build context, the owner, the owner's other consultants, and Altech, Inc. can work together to determine what methods and materials will maximize the owner's value. In instances where marginally more expensive materials, designs, or construction methods might yield a higher return on investment for the owner than those of lower cost, the owner is free to adjust the project's program without having to re-bid the project. Construction ManagementThe CM Delivery System involves three phases, the Design Phase, the Construction Phase and the Post Construction Phase:
|
Web design by: Joe Regan
Owner of: WebProJoe.com Web Design Company